x

Shane Long Leading The Player Of The Year Polls

With the season nearing it's climax and the player of the year awards up for grabs Shane Long is the front runner.

The Ugly Inside poll for player of the year is obviously a lot smaller than the poll conducted by the Daily Echo which since it's inception in the mid 1970's was the the official club player of the year award till Nicola Cortese banned the paper from St Mary's a few years ago.

However both polls are very similar in their voting in that Shane Long is way out in front in what is turning into a two horse race.

In our poll Long has 50% of the vote with Virgil Van Dijk in second place with 36%, the only other player to register anything of note is Steven Davis with 12%. The other 2% is split between 3 players.

On the Echo website the results are similar, Long is enjoying 46% with VVW on 38% Steven Davis has 5%, Sadio Mane and Fraser Forster 3% each, Ryan Bertrand & Jose Fonte 2%, Pelle has 1% with the final player that the Echo nominated, Victor Wanyama, not appearing to have received a single vote.

So unless there is a big swing in the final days then Shane Long looks set to deservedly win the award, it is a pity really that the vote isn't shared as Virgil Van Dijk would be equally deserving and I'm sure that many Saints supporters found it difficult to decide between them

That in itself is an anomaly in that most years there is a stand alone winner polling 75% + of the voting.

The Ugly Inside poll is of course the most prestigious of the polls, the winner will win either a top of the range Bentley, or failing being able to persuade a Bentley dealer to donate one as a prize, a Northam Soul T Shirt.

To vote in the Ugly Inside poll click on the link below.

http://www.fansnetwork.co.uk/football/southampton/members/!/polls/1369/who-shoul

What to read next:

Honours even in hard-fought draw at Elland Road
It looked like a good opportunity to achieve a famous victory over Manchester United, but in the end we didn’t show quite enough quality at either end of the pitch to force a win over our deadliest rivals.
Disciplined Leeds earn away point at Anfield
It was a frustrating night for Liverpool, as for once Leeds produced a defensive masterclass, to stretch our unbeaten run to seven games, in a period of the season when we are playing some of the biggest names in the Premier League.
Liverpool Awaydaze
Our visit to Liverpool will kick off at 5.30 on New Year’s day, thanks to live coverage by our friends at Sky TV.
Farke accepts Leeds have more to do after draw at Sunderland
Leeds can be delighted with the second half performance at Sunderland, which should really have earned us all three points, but Daniel Farke knows we will have to keep this run going before we can start to think about being safe from relegation.
Sunderland Awaydaze
Our game at Sunderland kicks off on Sunday at 2pm, thanks to yet another Sky Sports selection. You'll find the Stadium of Light on the site of the former Monkwearmouth Colliery on the north bank of the River Wear, the opposite side from the city centre.
Calvert-Lewin brace takes Leeds to win over sorry Palace
With Crystal Palace’s away record this season it could have been a difficult game, but Leeds produced a high energy performance to keep the good run going and pull six points clear of the bottom three
Brentford 1-1 Leeds United: Calvert-Lewin header earns deserved point
Dominic Calvert-Lewin scored for a fourth successive game to earn Leeds a crucial first point on the road since September.
Opinion: Brentford set example Leeds United would do well to follow
Sunday’s opponents Brentford are one of the best-run clubs in the country. They haven’t sacked a manager in more than ten years. We’d be wise to think on that before telling Daniel Farke to piss off.
Brentford Awaydaze
Our visit to Brentford will kick off at 4.30PM on Sunday, thanks to our very good friends at Sky Sports.
Disappointingly brief FA Cup Draw sends Leeds to Derby
Leeds are going to Derby County in the 3rd round of the FA Cup, after TNT sport and the FA were shown to be lagging way behind FIFA when it comes to staging a pompus, shamlessly self-promoting and needlessly drawn out draw for a major competition.